I know nothing will change out of this thread, but there is some progress in my neck of the woods. Some of the newer contracts have been tossed back and forth between companies and I think the low-balling of bids have started to catch up with the damage prevention side of the contract. I have seen where they have changed the verbage in the contracts to bill in 500 to 1000 foot increments.
For example: a 3000' locate can now be billed out for 3 charges (if billing in the 1000' increments) or 6 charges (if billing @ 500' increments)
The sad part is, this means nothing for the Field tech but more paper work. They still get the same # of tickets, and hold overs each day. The company will bill at those increments depending on the contract, but the Locators production is still based on tickets, and you have to hit your quota of 2 tickets an hour for an 8hour day. Sure hope you don't have any marathon locates.