Mine was 7 miles putting in a lath every 5m with a 5m offset. almost 70 bundles (50 sticks per) and took 9 days.
Did I mention there was 3 ft of snow and it was in the Rockies off the Alaska Highway in January?
They were putting an old lease back to bed (abandonment) and needed to get a service rig in to 'complete' the well. There was a 20" midsteam line and the owners were very sensitive to equipment near their line.
It was rude.