So, we are kinda slow right now. Yesterday we only had 4 tickets between two locators. 3 were sign locates for the same intersection, and one was a street crossing for the cable company. Thats it.
Untill I recieved a call from our on-going projects, I took 4 additional locate requests, 1) Inside of tunnel 2) 3000' fence locate 3) Catch Basin install in conjested area. 4) Locate Air line for compaction testing (300' long W/tracer)
I proceeded to call my "co-Worker" and asked if he could pick up the Air line locate. He told me he was already heading in the opposite direction. I told him this was a higher priority then the 3 sign locates. He proceeded to tell me that he was already heading in the opposite direction, and he planned on eating lunch out in the area of the sign installs and he couldn't do the air line locate "any time soon"
I don't ask for much. All I want is to work with someone who has the same pride in their work that I do.
We have a great job. I feel one of the best in the industry. We are respected by the construction side of the company as well as the Engineering side of the company. When it comes to Utilities we are supposed to be the "go to" guys.
What in the Hell am I supposed to do with a co-worker who's more interested in getting out of work then doing work?
Do I let my boss know? Do I let him slide and hope he bursts into flames?
I'll follow that up with anyone willing to move to the Pacific Northest and paint in the rain?
Mke



LinkBack URL
About LinkBacks




Reply With Quote




Bookmarks